The bathtub has gradually become a single item that every household likes to add, improving the quality of life. After being tired, taking a bath comfortably is simply enjoyment. However, the installation of the bathtub is a problem. What should you pay attention to when installing? Xiaobian tells you.
The first step: test whether the water is leaking
“Before installing the bathtub, install the water fittings first, do the water shutoff, and see if the bathtub leaks. Pay special attention to the overflow.â€
After lifting the bathtub into the bathroom, install the water fittings, fill the bathtub with water, close the water, check for water leakage. When the water flows over the overflow, the water in the bathtub flows out from the overflow. Hold your hand under the bathtub and touch the back of the overflow to see if water leaks from it. After the test of the overflow water is passed, the sealing of the sewage is checked next, and the method of standing can be selected to observe the sealing property of the sewage.
It should be noted that the center point of the width of the bathtub is at the center of the faucet. This point must be thought of when the water is changed at the beginning. The width of the bathtub is 700. 750? 800? Once the water is changed to determine the size of the water, try to buy the bathtub according to this, otherwise It is very difficult to change the size of the mixed water from the wall.
Step 2: Leveling the bathtub
When placing the bathtub, pay attention to the other end of the water outlet slightly higher than the end of the water outlet, so that the sewage will be poor in the future. This depends on the situation. The bottom of the normal bathtub is originally left with the slope of the drainage.
The third step: sand filling
Although the cast iron bathtub is strong, its thermal conductivity is very fast. It should be used in Zhonghesha, and it should be laid and tamped at the bottom of the bathtub. In the process of filling the river sand, in order to prevent the sand from leaking into the lower pipe, the fireman recommends: first seal the drain with glass glue, then use plastic sheeting, entangle the drain and the water pipe, and then fasten it with tape.
After all the placement work, the water release test is repeated (this step is mainly to ensure that the bathtub is not moved behind to make the water leak). After confirming the correctness, wait for the bricklayer to build the skirt.
After the bricklayer enters the scene, the river sand is filled in from all the gaps. The filling process is to fill the sand and use the wood boards, hands, feet, etc. to fill the sand as much as possible.
The fourth step: check and repair
300 mm width 400 mm high leaving a hole in the collector nozzle, the interception of an opening sized according to size of the clipped done water, preservative treated wood (thickness 40 mm), calculated on the plate according to the number and arrangement of the tile brick veneer on the board. Extend the edge of the brick with a sealant and set it on the box.
Step 5: tiling
The tiling of the bathtub skirt does not need to catch the hair. The table with the red brick is built, and a layer of cement mortar is applied on the surface, and then the bricks can be affixed for two days. The tiling is very troublesome, because the ground leaves the slope, and the bathtub It is flat, so every big brick should be polished to different sizes. It can't be polished a lot at a time. It is easy to grind more and it needs to be repeatedly ground. The top edge of the brick should be tucked under the rounded edge of the bathtub so that no positive angle is formed.
Concerned about surprises
Tags: Tub Installation Precautions on
Previous: Gas Water Heater Installation Precautions Next: What materials are used to select the door?