Big secret! How waterproof is the most suitable kitchen waterproof?

The kitchen is a place where there is more water for home use. The sink often has water splashed on the floor when washing dishes. If the water is not well done, it will affect normal life. Therefore, the kitchen needs better waterproof performance. Need to waterproof the kitchen. What about kitchen waterproofing? How high is the kitchen waterproof?



1, the kitchen's waterproof treatment is also important, because the kitchen has cabinets, hanging cabinets, not only should pay attention to the kitchen's waterproof but also to prevent water from leaking out.

2. Clean up the construction site and water it so that it is fully wet but there should be no accumulation of water.

3, waterproof material varieties, trademarks and mix ratio, must comply with the relevant standards of environmental protection standards. The product has proof of appearance certification.

4, brushing the basic level of the waterproof layer, shall not be uneven, loose, empty drum, sand, cracking. The moisture content is less than 10%. The kitchen floor waterproof layer with floor drain is upwards and upwards in contact with the wall body. It is no less than 25 cm above the ground. It does not float or collect water. The 24-hour closed water test has no leakage.

5, waterproof layer adhesive firm, no slip, sled, blisters, wrinkles. Floor drains, drain outlets, etc. are kept open and protective measures should be taken during construction.

6, pass through the wall, floor, etc. in order to stabilize the good roots, should be protected during the construction process shall not damage the displacement; on all parts of the gap is easy to produce fine processing to prevent leakage.

7, kitchen waterproof construction, the first pre-embedded water supply and drainage pipelines, clean up the entire wall ground base, after scraping a layer of plain cement slurry to be dry, the wall surface brush twice waterproof material once completed, you can also first do wall waterproof, interface Department must be handled well, up and down crossover should be 200mm, double waterproof.

8. The total thickness of the waterproof layer on the wall (water-repellent mortar + waterproof mortar) is not less than 10 mm and the height is not less than 1800 mm.

9. Mix the waterproof product with cement into a water-repellent mortar. Brush the base surface one or two times with a total thickness of 2 mm.

After 10 minutes and 20 minutes, the water-repellent mortar is dry, and it is mixed with waterproof and cement, and the sand is mixed into a waterproof mortar. The surface is put on the surface of the waterproof ash and the thickness is 8 mm.

11, 24 hours after the waterproof mortar layer solidified, sprinkle water conservation.