The reason why you choose us
· ISO System
· SGS and BV Audited company.
· Industry experience over 50 years.
· Management Systems-Internal Software
· Finished Product Inventory-More Than 5000 Tons.
· Raw Material inventory -Over 8000 Mertic Tons.
· Shipment of goods -More than 70 countries worldwide.
· The most convenient transport and prompt delivery.
· Competitive price with best service.
· High technical production line with top quality products.
· High reputation based on best quality products.
Choose Tiangang, Choose Top Guarantee!
2. Product description
1>Item: Galvanized steel coil, galvanized steel plate, steel plate
2>Standard: GBT2518-2008, ASTM A653, JIS G3302-1998, EN 10142-2000
3>Grade: Q195, Q235, Q345, 10#, 20#, A53, A36, SGCC, DX51D, DX53D, DX54D, etc
4>Zinc coating: Z60--Z275
5>Treatment: Hot dipped galvanized, prepainted
6>Package: Standard export seaworthy package or as required.
7>Application: Chemical industry, construction, ship, electric, etc
8>Contact: If you have any questions, please feel free to contact me.
Material | Galvanized steel coil,galvanized steel plate,steel plate,hot rolled steel coil,high quality steel coil | |
Standard | GBT2518-2008,ASTM A653, JIS G3302-1998,EN 10142-2000 | |
Grade | SGCC,DX51D,DX53D,DX54D.Q195,Q235,Q345,etc | |
Thickness | 0.3mm-3mm | |
Width | 500mm~1500mm | |
Zinc coating | Z60--Z275.or according to customers' requests    | |
Surface Treatment |
Hot dipped galvanized,prepainted | |
Trade Terms | Price Term | EX-Work,FOB,CFR,CIF,CNF |
Payment Term | T/T,L/C,Western Union | |
Delivery time | Prompt delivery or as the order quantity. | |
Package | Standard export seaworthy package or as required. | |
Export to  |
Ireland,Singapore,Indonesia,Ukraine,Saudi Arabia,Spain,Canada,USA,Brazil,Thailand,Korea, Italy,India,Egypt,Oman,Malaysia,Kuwait,Canada, Viet Nam, Peru,Mexico,Dubai, Russia,et | |
Application | Chemical industry,construction,ship,electric,etc | |
Contacts | If you have any questions, please feel free to contact me. |
Â
Solar Mounting System For Green House
The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing.
Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)
Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.
Solar Panel Mounting Frames,Solar Panel Mounting Systems,Greenhouse Solar Mounting System,PV Mounting Systems
Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com