After the house was handed over, it was a matter of decoration. Many people handed over the house to the decoration company because they had no time to take care of it; but there are also many people who choose to renovate themselves, so how to decorate the house themselves? What are the specific construction processes? Then the following editor Introduce how to install the house under renovation , and its main construction process, let's take a look!
How to decorate the house?
Main process 1. Main body dismantling
The main body renovation is the first construction project to be carried out. The main body dismantling and modification mainly includes the demolition of walls, the removal of heating equipment, the shoveling of the wall skin, etc. In fact, it is to put up the frame of the construction site.
Main process two, hydropower transformation
Before the renovation of the water and electricity, the cabinet measurement should be carried out, but the cabinet measurement has no actual content, but only puts forward some suggestions based on the location of the water outlet and the range hood socket reserved by the developer, mainly including: Will the position of the range hood socket affect In the future, the position of installing the range hood, the position of the water meter is suitable, and the position of the water inlet is convenient for installing the sink in the future; after the waterway reconstruction is completed, it is best to do the waterproof work of the bathroom, and the kitchen generally does not need to be waterproof. The materials needed for the theme remodeling will not be admitted until the hydropower renovation.
Main process three, carpentry
The "three brothers" in the construction process are carpenters, masonry, and painters. Their order of appearance is based on the principle that whoever gets dirty first comes first.
Main process 4: Painting wall paint
Oil workers mainly include wall base treatment, brushing topcoat and furniture lacquer, if you need to paste wallpaper, you only need to do base treatment on the wall.
Main process five, floor installation
The floor can be installed the next day after the carpentry is done, generally it can be installed in about 2 days; installation of the floor needs to be careful, the floor of the floor must not have debris, etc., to ensure that it is clean and dry before construction.
Main process six: Furniture and home appliances enter the market
Furniture and home appliances can be purchased after the renovation of water and electricity, but there is no need to order furniture and home appliances before they are renovated.
Main process seven, home furnishing
After all the processes are completed, it is time to install decorations, such as curtains, paintings, and furnishings. It is best to buy curtains after the furniture is set to avoid conflicts in style.
Editor ’s summary: The above is about how to decorate the house and what are the main processes for decorating the house . If you do n’t know how to decorate the house , you can follow the above process. I hope it will be helpful to everyone and I want to know more about it. Content, you can pay attention to the information on this website.
What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount
How to decorate the house
Pvc High Gloss Edge Banding Series include that: All solid colors can produce high gloss surface; all woodgrain colors can have the high gloss surface.
We mainly supply customize color and size as per request. Size ranges 0.35-3.0mm thick and 12-620mm width. We adopt high quality PVC resin, Germany exported ink and UV. Strict quality control system to keep the quality of Pvc Edge Banding.
Pvc High Gloss Edge Banding
Pvc High Gloss Edge Banding,High Gloss Pvc Plastic Edge Banding,High Gloss Pvc Edge Banding,Wood Grain Furniture Pvc Edge Banding
Sinowolf Plastic Dekor Co., Ltd , http://www.sinowolfdekor.com