Report of Linyi Economic and Information Technology Commission on Shanxi Zhongsheng Iron and Steel Co., Ltd. Applying for Capacity Reduction and Renovation and Construction of 1×155 Ton Converter and Supporting Projects
Provincial Economic and Information Committee:
Shanxi Zhongsheng Co., Ltd. is located in Yonggu Township, Ji County. It is a joint enterprise integrating steel making, iron making and steel rolling. The existing main production facilities include a 1200m3 blast furnace, two 60-ton converters, and a 1 million-ton double-line double-shear hot-rolled continuous bar production line.
In order to implement the national deployment of the key areas of air pollution prevention and control, such as the flood plains, and accelerate the promotion of the ultra-low emission transformation of the industry, according to the "13th Five-Year Plan for Metallurgical Industry Development in Shanxi Province" (Jinfa Reform Planning [2016] 538 No.) and the "Rules for the Replacement of Production Capacity of Cement Flat Glass Electrolytic Aluminum Industry in Shanxi Province" (Jinjingxin Investment Word [2018] No. 89), in accordance with the requirements of "active elimination, reduction and replacement, upgrading and upgrading, green development", The company has formulated a 1×155-ton converter and supporting upgrades and modifications for its own 2×60-ton converter and supporting facilities. Through the implementation of the project, it will further accelerate industrial transformation and upgrading, strengthen energy conservation and emission reduction, upgrade equipment level, optimize product structure, improve industrial concentration and resource utilization efficiency, and achieve savings, high efficiency, low carbon, green and circular development.
The details of the capacity reduction replacement and the implementation plan are as follows:
Shanxi Zhongsheng Co., Ltd. has two 60-ton converters with a production capacity of 1.7 million tons, and a 155-ton converter with a capacity of 1.65 million tons to meet the capacity replacement requirements of the construction project. The remaining 50,000 tons are used for reduction. The project is scheduled to begin in June 2019 and will be completed in December 2020. The project is built in accordance with the principle of “environmental protection priority, energy saving and consumption reduction†to achieve ultra-low emission transformation requirements. After the completion of the project, it will be able to meet the capacity of ironmaking and steelmaking processes, and will also lay a solid foundation for building green enterprises. The project site is reconstructed in the plant area of ​​Shanxi Zhongsheng Co., Ltd., and no new construction land is needed. The corresponding converter for replacement is removed before the project is completed and put into production.
The company will now report the 1×155-ton converter and supporting engineering plan for the capacity reduction and replacement of the company, and please confirm it.
Hereby report
Linyi City Economic and Information Committee
June 11, 2018