It is well known that hydropower projects are the highlight of the home improvement process, and this process should be completed in the early stages of the renovation. However, before the implementation of hydropower deployment , the owner needs to do a good job of installing the hydropower budget so as not to cause unnecessary or excessive waste of resources. The hydropower installation price budget table can intuitively reflect the materials needed for installation and the installation price, and then make repeated comparisons and modifications, which will enable us to prepare in advance for relevant preparations. Of course, the hydropower installation budget is not so simple and easy to do. If you want to know how to do a hydropower installation budget , take a look with me!
Hydropower Installation Budget - Waterway
material:
a, 20PP-R water pipe (concealed): 60 yuan / meter
b. 20PP-R water pipe (surface mounted): 45 yuan/meter
c, launching installation (50PVC pipe): 60 yuan / meter
1, one meter each with equal diameter and different diameter sleeves, one 90 degree elbow
2, does not contain valve hardware
3, 25 pipes plus 10 yuan per meter
4, less than one meter by one meter
5, drilling another charge, bearing wall 40 yuan / month, non-load-bearing wall 20 yuan / month
6, PP-R pipes are thick 2.8 hot water pipe
7, under the water pipe calculated by 50 greater than 50 to be negotiated
Construction quotation:
Dark pipe PP-RDNS2.820mm38 yuan / extension meter
Ming PP-RDNS2.820mm28 yuan / extension meter
Dark pipe PP-RDNS3.525mm55 yuan / extension meter
Ming PP-RDNS3.525mm46 yuan / extension meter
Wall hole bearing wall 50 yuan / hole
Wall hole non-bearing wall 20 yuan/hole
Water meter 200 yuan / only
Valve DN25 90 yuan 1
Valve DN20 70 yuan 1
Hydropower installation budget - circuit
Weak current:
Telephone line (Ming 15 yuan/meter, dark 20 yuan/meter) TV network audio line (Ming 15 yuan/meter dark 20 yuan/meter).
Add 16 information integrated boxes plus 160 yuan/set. After ensuring that there is no joint in the pipe and the trap pipe is buried, fill it with plaster or cement mortar. Dark pipe price: 28 yuan / meter, Ming tube price: 18 yuan / meter
Lighting installation and panel installation, the ground slot 10 yuan per meter, spotlights or lamp light hole 10 yuan / month, without lamps. Ceiling lamp 15 yuan/piece, small chandelier 2 to 5 small lamp 30 yuan/piece, chandelier 6 small lantern above 35 yuan/piece, switch and socket installation additional charge, 30 or less charge 5 yuan, more than 30/3 Yuan, 30 yuan per lamp.
Strong electricity:
Dark tube 2.5mm2 20 yuan/meter? Single tube 4 mm2 25 yuan/meter? Single tube 6 mm2 30 yuan/meter? Single tube 16 mm2 above 50 yuan/meter?Single tube
Flame-retardant electrical tubes and wires: no more than 3 wires, if more than 5 yuan per meter.
No wire in the pipe, split box at the branch line
Junction box wiring: zero. Fire. Ground 2 groups docked 5 yuan. 3 groups docked 8 yuan. 4 groups docked 10 yuan. 5 groups docking 12 yuan. (Switch or socket each as a group)
Junction box cover: 15 yuan / month
Lighting lead: 10 yuan / meter (less than 1 meter by 1 meter)
Installation cassette 86 × 86 10 yuan / month
Installation box 86 × 86 5 yuan / month
Wear wall eye-bearing wall 40 yuan / non-bearing wall 15 yuan / month
Box black box 200 yuan / a mounted 100 yuan / month
Hydropower installation budget price detailed list
Weak wall mounted: 18 yuan/meter, the other is the same as the weak relay.
Strong power installed: 2.5mm225 yuan/meter, the other is the same as the weak power concealed.
Water pipe installed: 45 yuan / meter, material 20PP-R. Faucet: Specifications: 15, 20, price 8 yuan / month
Water meter: specifications 15, 20, price 30 yuan / a total valve: size 25, price 30 yuan / month
Flushing valve: Specifications 15, 20, price 20 yuan / month Drainage pipeline: specifications below 40, price 12 yuan / meter
Fluorescent tube: specifications 20W, 30W, 40W, price 20 yuan / root without wiring Ceiling grille light: specifications 40W-120W, price 40 yuan / set without wiring
Ming, concealed wall switch: Price 10 yuan / socket (3-5 holes): Price 10 yuan / month
Ceiling Fan: Specifications 1400 mm or less, price 40 yuan / Taiwan does not include wiring air fan: specifications below 250 mm, price 30 yuan / Taiwan without wiring
Circuit Breaker: Specifications 16A-60A, price 15 yuan / month, 60A above, 30 yuan / meter: Specifications 10A-60A, price 30 yuan / month
Switch box: 200mm*300mm, 25 yuan/pc. 300mm * 400mm, 50 yuan / slot layout: 20-40 mm, 5 / m. 40mm, 10/m. 40-60mm, 15/m. 60-100mm, 20/m. 100-200mm, 25/m
Additional information:
1. This quotation includes pipe, wire, wiring, construction, slotting, and pressure test. Does not include sealing slots, does not include waterproofing, and installation of sanitary ware. Charges are calculated based on actual metered usage.
2. The waterway reconstruction does not include special fittings and valves, and special accessories need to be purchased by the owner himself. Water meter 50 yuan / month
3, high-rise steel reinforcement pouring structure per meter plus 3 yuan slotting, coincidence plus 3 yuan each.
4, hot and cold water pipes all use hot water pipes, due to the owners of the design is not in place and after the installation of pipelines artificially damaged on-site maintenance need to receive manual fees.
Note: This price is for reference only! Due to geographical differences, of course, the price will be different. For more details on the prices, please refer to the local distributors!
Editor's summary: The hydropower installation budget is indeed a little bit troublesome, but compared to the problems that arise during the installation of hydropower, this is not a comparison. The hydropower installation budget can reflect the installation materials and the installation price of hydropower perfectly. Therefore, the hydropower installation budget is very necessary and very important.
Simple living room effect beautiful simple decoration living room bedroom simple decoration simple kitchen tile decoration design two bedroom one simple decoration design
SC serial Construction Hoist (Construction Elevator)with single cage and twin cage to the customers, the capacity ranges from 1000kg,1200kg, 2000kg,2700kg,3200kg, and with direct motor driven and frequency conversion driven to reach the lower speed of 36 m/min, middle speed 0-63m/min and high speed 0-96m/min. And also provide the different dimension of cage to satisfy the special demand from the customers.
Hoist Parts,Construction Hoist Parts,Tower Crane Section,Potain Standard Section
Jinan Shanghangda Machinery Co., Ltd. , https://www.shdtowercrane.com