What about the overall cabinet installation program? What is the installation standard?

The whole cabinet is unique and can add a lot of color to the kitchen. However, the overall cabinet installation procedure is sloppy. Once the installation process is wrong, not only the decoration effect is greatly reduced, but also the function of the whole cabinet itself is affected. In order to avoid such unnecessary troubles, Jiuzheng Building Materials Network Xiaobian today teaches everyone how to perfect the overall cabinet installation.

1, the whole cabinet installation program

(1) Installation of the cabinet: This is the first step in the overall cabinet installation process. Everyone should clean the ground before installing. The most common floor cabinets are L-shaped and U-shaped. You should carefully measure the size of the kitchen, then find the reference point and make the connection between the cabinets.

(2) Installation of the hanging cabinet: As the second step of the whole cabinet installation procedure, we must ensure that the cabinet is tightly connected when installed, and the horizontal line and the table are at a moderate distance.

(3) Installation of the countertop: The installation of the countertop is placed in the third step to reduce the error. Since the cabinet and the wall cabinet have been installed, the table top will be much more beautiful when installed.

(4) Installation hardware: kitchen hardware has faucets, sinks, switch panels, etc. Since hardware affects the quality of our lives, we should be extra careful when buying and installing, such as hoses and hoses should be glued with sealant.

(5) Installation of the cooker: This is the last step in the overall cabinet installation procedure. The installation position of the cooker such as the range hood should be carefully considered, and the power hole size should be appropriate.

2, the overall kitchen cabinet installation standards

(1) When the whole cabinet is installed, the door drawer should be open and free, flexible and noiseless, and the gap between the door and the door should be less than 4mm. Whether the door drawer is installed or not is very important for the various activities of the kitchen in the future, so the door drawers should be parallel and the doors should be installed straight.

(2) When installing the whole cabinet, pay attention to see if the cabinet is horizontal. The design feet like the corners should be very tightly combined; the error of the diagonal of the big corner should not exceed 2mm; the opposite of the upper cabinet should not be heavy rain. 0.5mm, the distance between the four bottom corners of the lower cabinet should not exceed 1000mm.

(3) When the whole cabinet is installed, the table top should be horizontally designed, and the interval between the gaps should not be more than 3mm, so as to minimize the obvious seam marks.

The overall cabinet installation standard is introduced here. I believe that combined with the previous cabinet installation procedure, everyone has a better way to install the whole cabinet in the kitchen. Jiuzheng Building Materials Network Xiaobian here to remind everyone that the size and design style of the overall cabinet should be consistent with the overall room size and decoration style!

[Scan the QR code below, pay attention to the WeChat public number "Jiuzhen cabinet network "; you can view the popular article " The secrets of the rich sitting in the first class of the plane!" ", want to communicate with peers can join the Jiuzheng building materials network cabinet exchange group]

Jet Diffusers