Decoration is completed, it is necessary to the owner to check, this is also known to everyone, decoration, there may be some construction quality problems, such as cracking deformation, leaking water, etc., or the operation is not standardized faults, damage problems, these are decoration The company needs to carry out free repairs! But the premise is that you must check these problems when you check the house. It does not mean that the problem is checked when the house is inspected, and then you make money when the house is reworked. The acceptance of the building itself is to check whether all the construction of the house is completed, whether the construction quality is qualified, and whether the construction materials are in compliance. This is an important part of confirming that the decoration company has completed the project, and it is also an important item for the owner to check whether the house is qualified! However, how to check the house? Let's take a look now!
Homework completion acceptance four steps
1, inventory items
The user and the decoration company jointly check the items listed on the decoration project contract and the project modification visa list item by item to see if the contents of the listed items are all completed. Items that are not completely completed will not be accepted. Major renovation projects, such as wall surfaces, floors, doors and windows, etc., which have not been completed completely, shall be postponed for completion acceptance.
2, check the quality of decoration
First check the material type, specifications, etc., then carefully examine the appearance quality, and then use the inspection tool to measure the deviation value. According to the quality standard of the corresponding decoration project, it is determined whether the project meets the requirements and the qualified person can check it. The types and specifications of materials used in each project must meet the design requirements. Those who do not meet the design requirements must rework and rework. If the quality of the appearance does not meet the quality standards, both parties may negotiate repairs or partial rework. In the inspection, the number of inspection points exceeding the specified deviation value shall not exceed 30% of the total inspection points. It shall be judged as qualified and acceptable; if it exceeds 30%, the project shall be judged as unqualified, and shall be repaired or partially reworked, and then acceptance.
3, sign the completion acceptance
Both parties fill in the completion acceptance form one by one according to the inspection results of each renovation project. Its content includes the name of the renovation project, project quantity and quality assessment. The column “Disposal Method for Assessment of Disqualified Projects†in the acceptance checklist shall be decided by both parties, stating that the decoration company shall be responsible for repairing or rework, and the decoration company shall be responsible for those who are permanently impaired due to difficulty in repairing or rework. Compensation.
4, recover more than expected material
After completion of the acceptance work, the user shall clear the remaining materials from the purchased materials for repair and use in the event of future repairs. For materials that have a shelf life, if the owner does not want to save it, he can negotiate with the decoration company for a discount, or he can handle it separately.
Precautions for Completion of Housing Inspection
1. Acceptance standards for water supply and drainage pipeline installation engineering: The quality of pipelines and pipe fittings should comply with the current standards; the valve installation should be upright and the switches should be flexible; after the water pressure test, all pipelines, valves and joints should be free of water seepage and water leakage.
2. Acceptance standards for electrical engineering: The leakage switch is correctly installed and used normally; the installation and fixing of electrical devices and equipment should be firm and smooth; the electrical power-on test, lighting test and lamp control performance are good; the appearance of switches, sockets, terminal boxes and other devices is in good condition. , Insulation devices without cracks, installation firm, flat, installation methods in line with the provisions of the parallel installation of the switch, socket terminal box deviation, concealed switch, socket, terminal box panel, box around the gap in line with regulations; weak power system function right To meet the requirements of use, the appliance is firmly installed and is flat.
3. Acceptance standards for the installation of wooden floors: The materials should meet the requirements of the households and the current product standards; the floor installation (bonding) should be solid, no sound, no looseness; the wooden floor surface should be polished, no planing, shavings and Burrs and other phenomena, the varnish floor pattern (grain) should be clear; parquet floor seams should be aligned, the gap width is consistent, the surface is clean, no plastic spill phenomenon; skirting board and the floor is closely connected; skirting board along the straight, full-length Height difference should be no more than ± 3 mm close to the wall, seamless.
4. Acceptance standards for construction quality of plastic board surface: The material, color, and paving shall meet the requirements of the households; the surface shall be smooth, smooth, wrinkle-free, and shall not be edging or bubbling; the color shall be the same, the joints shall be tight, the four sides shall be straight, and the degumming Must not be larger than 20 mm, and the spacing between them must not be less than 500 mm; the joint with the pipeline should be tight, firm and flat; the skirting board should be tightly connected with the plastic board; the skirting board should be straight and the overall length should not exceed ±3 mm in height; Close to, seamless.
5. Acceptance standards for construction quality of plate surface: The materials and patterns are in line with the requirements of households, and the product quality conforms to the national standards and technical regulations. The paving should be firm and not loose, and the ground level elevation should not exceed 0.5 mm; the paving pattern should be clear and free from contamination. Slurry marks; straight seams, pull seam inspection, deviation is less than 2 mm; seam width is not greater than 1.0 mm; seam height difference between the block and block is not greater than 0.5 mm.
About the relevant content of the four steps of acceptance of home improvement, Xiao Bian introduced here. Home improvement, acceptance is the best level of quality control of the project, in order to ensure that you have a quality of peace of mind at home, when the acceptance of the house must be careful, beware of future regret! If you have any other questions, please leave a message and we will answer your questions as soon as possible. For more information, please follow this website!