In the traditional decoration market, the construction party will only provide the unit price of hydropower reform on the date of the signing of the renovation contract on the day of signing the renovation contract, and indicate that the project volume will be calculated according to the actual amount of production. The owner does not know the future needs of its own hydropower reform before the renovation. How much money is spent, you can only estimate a figure based on your own feeling or make a budget through the experience of construction workers. Under this circumstance, when calculating the quantity of hydropower after the completion of hydropower reform, the settlement amount is often far from the original estimate, exceeding half or even more than the psychological expectation. How can this situation be avoided effectively?
First, as an owner, you need to touch your belly to ask if you know what you need before designing your hydropower.
1. Requirements for basic functions such as network, telephone, telephone; projection, video sharing, background music, satellite TV, security and other additional function requirements.
2, the study room, the master bedroom, the second bedroom, living room, dining room, kitchen, bathroom function zone division plan
3, whether the kitchen kitchen cabinet solution is done (this work can be about kitchen cabinet designers and water designers at the same time design, business consultation)
4, family life with hot water - 24 hours hot water system or gas water heater or heat storage electric water heater or solar energy or other ...
5, bathroom with shower or bathtub, cabinet basin or pedestal, whether the toilet with additional features, washing machine planning size, etc.
6, room furniture electrical layout, specific to the width of the bed size or wall-mounted LCD TV size need to understand, be aware of.
7. Complicated gypsum board ceilings, style walls, multiple treasures, background walls and other light effects renderings (by owners and interior designers)
Second, to implement the above work, the key to solving the problem of over-expenditure of hydropower reform lies in the professional and detailed design.
There is no complete solution without detailed design and accurate positioning. Of course, it is impossible to calculate how much it will cost. Visit the construction site and tell the hydropower designer the effect or result you want, and make a full site-by-room trip to form an accurate on-site location. Careful to move the position of a socket away from the wall, the size of the lamp and the lamp are determined. Needless to say, one hour later, the thought of thinking about the effects of past needs cannot be clarified. Oh, this is what I need.
3. Back to the topic of this article, according to the detailed design and positioning plan, the designer is required to issue a more accurate pipe (line) plan at the scene. The site calculates how much money the hydropower reform may take, which is called budget, and requires the construction party to The budget amount and its error range are written into the construction contract signed by both parties. This kind of hydropower reform program is both detailed and has legal basis for total price control. It is difficult to overspend!
Water Renovation Decoration Design TV Decoration Living Room Background Living Room Rendering Electric Water Heater Decoration Ceiling Rendering Effect Interior Decoration Effect Picture Kitchen Cabinet Decoration Effect Picture Decoration Living Room Kitchen Cabinet Door Study Furniture Study Design Study Room Bathroom Door Study Picture Bathroom Door Size Bathroom Size Toilet Ceiling Bathroom Design Small Study Dining Room Furniture Bedroom Restaurant Ceiling Dining Room Ceiling Picture Bedroom Lamp
Door panel: door panel is made of stainless steel 304 with no frame. Core materials are paper honeycomb, aluminum honeycomb, PU, EPS and etc. The installation sites of door lock, door closer and hinge are reinforced with square tubes of more than1.5mmthickness which are compression moulded by special technology.
Door frame: it is made of completely stainless steel 304. The connection types with wallboards are double-clip type and aluminum connection. The former is applied mostly to machine made wallboard and the latter hand made wallboard. The accessories are double window and lift type sweeping bar. The lock can be famous door lock or the owners can select lock brands themselves.
Specification: common sizes 800X2100, 900X2100, 1500X2100 or1800X2100, can customize to customers` requirements, the materials can be selected according to customers` requirements such as306Lor other special materials.
Features: the stainless steel 304 door we produced are of elegant appearance, sturdy and durable, acid and rotting resistance and thermal insulation. It is the first choice for high-end projects at home and engineering concerning foreign affairs that requires for anticorrosion and high quality such as electronics factory and food factory
Hospital Sliding Door,Hospital Automatic Sliding Door,Hospital Sliding Glass Door,Hospital Sliding Ward Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.highspeedshutterdoor.com