Solid wood floor maintenance needs to pay attention to several major issues

In order to prevent insects, the first is to purchase the floor produced by the dry kiln steaming process. Although the price is relatively expensive, all the eggs in the wood have been killed. Second, the keel is carefully selected, and there are insects or bark. , no need to.

Quilting

Some floors were laid for a few days, and there was a big gap between the slats. Most of this is related to the high moisture content before the floor is laid, and it shrinks due to high temperature or air drying in the room. Note that the moisture content before laying the floor should be between 8% and 13%, and oil should be applied in time after the paving.

sound

Due to the low quality of the floor laying, people will make a creaking sound when walking around. To this end, pay attention to the keel and the ground, the nail between the floor and the keel should be nailed firmly, and the number and length of the nails should be appropriate. At the same time, it is necessary to prevent the quantity and length from being appropriate. At the same time, it is necessary to prevent the keel spacing from being too large or the water content to be too high, otherwise the drying and shrinking looseness after laying will also have a certain impact.

Dirty board

It means that some floors are painted, giving an unclean "ash" feeling, and some even the footprints are clearly visible. To avoid this, it is important to keep the surface of the board clean before polishing.

Drum

To ensure that the floor does not bulge, pay attention to three points:

1. At the end of the civil works, solid wood flooring cannot be laid immediately;

Second, if the living room is located in a humid environment, it is advisable to lay a moisture-proof floor;

3. When laying, the moisture content of the floor should not be lower than 6%. The main reason is that the solid wood floor is not caused by the regular drying treatment, so the plastic can be laid under the floor during installation. In addition, the floor is placed in the room to be laid two days in advance, so that the wood can be adapted to the temperature in the room and can also prevent warping.