Waterproof toilet bathroom waterproofing process

Everyone may hear that many owners are very important in regard to waterproofing projects. They fear that if they do not do well, there will be many problems. In fact, the waterproofing project is not so terrible. As long as you take care of every aspect of the waterproofing material problem during the renovation, each step should be done slowly, whether it is the waterproof of the bathroom or the waterproof of the ground. It was destroyed by the decoration work afterwards. The following Xiao Bian borrowed for everyone to introduce the bathroom floor to do waterproof and bathroom waterproof process.

Toilet waterproof construction practices

1, ground treatment

Before the waterproof treatment, be sure to level the ground first. If the ground is uneven or the effect is not good, it may cause cracking and leakage due to uneven thickness of the waterproof coating. Floor drains, wall corners, pipes and other joints should be made of highly flexible, flexible, water-proof paint, because the joint between the wall and the floor of the toilet will shift to the point of seepage.

2, after the waterproof layer to do a good job to stay for some time, so that the waterproof layer and the building better integrate, and then do a protective layer on the waterproof layer in the paving tiles, the construction process, can be sloppy. Protect the waterproof layer as much as possible.

3, waterproof is a hidden project, the follow-up construction may also damage the waterproof layer, if the floor tile has been laid, you can not smash the floor tiles, with professional repair sewing waterproof material, all the gaps will be good waterproof . The same applies to the waterproof construction after the toilet waterproof layer fails.

4. Waterproofing is a systematic project, and the causes and treatment methods in each place are not the same. Materials are the foundation, construction is the key, and follow-up services are guaranteed.

Bathroom waterproofing process

1, brush the first time waterproof paint. Before construction, ensure that the construction site is clean and dry. The waterproof coating should be completely filled with no missing material. It should be firmly bonded to the grass roots, free of cracks, bubbles and no shedding. The brushing height is the same and the thickness must meet the product requirements.

2, brush the second time waterproof coating. Note that there is a certain time interval between the first and second pass of the waterproof coating. After the first pass of the coating, the second pass can be performed. The specific time depends on the coating. The interval is too short and the effect of waterproofing will be greatly reduced.

3, shop protection layer. In order to prevent the subsequent construction from damaging the waterproof layer, a protective layer should be applied on the surface of the waterproof coating. The protective layer must completely cover the waterproof layer without any omission. It has a strong bond with the grass roots, no cracks, no bubbles, and no shedding.

4, closed water test. In the closed water test, the water at the highest point on the ground must not be lower than 2 cm, and it should be stored for at least 24 hours, and it should be considered as qualified after observing no leakage. If there is leakage, it needs to be redone and you must not neglect it.

Base treatment, cleaning, do leveling layer, bonding layer, additional layers, acrylic waterproof layer, water storage test, protective layer construction, secondary storage test.

1. Correctly check the elevation of the kitchen and toilet, and pay special attention to the correct position of the floor drain.

2. The quality of the wall leaks on the floor drains and pipe roots must be carefully inspected. The wall holes should be densely packed and the pipe roots must be made as required for caulking.

3, Yin Yang angle should be made into a circular arc, and straight, flat light.

4, leveling layer construction: base surface voids, cracks, inequality defects, repair and smooth with cement mortar. The base must be sturdy, smooth and clean, free of dust, grease, wax, mold release agents, and other debris.

5. After the leveling layer is dry, it can be used for waterproof layer construction. The construction period should be fireproof and waterproof. Construction workers should wear soft-soled shoes.

6, after the completion of the waterproof layer, to protect the finished product, no businessmen can move. After passing the inspection and passing the inspection, the company can apply for the concealed project acceptance visa before proceeding with the next process.

7. After the water-proof construction is completed, a water storage test is conducted and no leakage is considered qualified after more than 24 hours. After the installation of the equipment is completed, a secondary impoundment test is performed.

Toilet waterproof precautions

1, do leveling layer. First, use a cement mortar to flatten the floor (especially to redecorate the house) and then do the waterproofing. This will prevent leakage of the waterproof coating due to uneven thickness or penetration of the waterproof membrane.

2, to focus on the key parts. The seams between the wall and the ground and the joint between the upper and lower water pipes and the ground are the most prone to problems. Therefore, we must pay special attention to these parts. The treatment must be meticulous, and we must not be sloppy.

3, to waterproof the wall. In order to achieve a better waterproof effect, the general bathroom wall should also be about 30cm high waterproof treatment to prevent stagnant water through the wall. The wall adjacent to the bathtub is also higher than the upper edge of the bathtub and the shower height is 180cm.

4, do waterproof experiments. After waterproofing is completed, all sewers in the toilet shall be blocked and a water injection test shall be conducted. After 24 hours inspection, if there is no leakage around the bathroom wall and the ground, the waterproof quality of the bathroom is very good. Instead, find the leak and perform repairs.

Editor's summary: The relevant information about the bathroom floor waterproofing and bathroom waterproofing process was introduced here for everyone. I hope this article will be helpful to everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Decoration waterproof bathroom waterproof

Black Floor Drain

Black Floor Drain,Anti Odor Black Floor Drain,Black Tile Insert Floor Drain,Long Rectangular Black Floor Drain

Kaiping City Jinqiang Hardware Products Co.,Ltd , https://www.jmpowerdrain.com