The first step is to clean up the construction site, and to trim the edges or corners, such as protrusions or uneven parts, on the ground level (measure the ground flatness with a two-meter ruler, and the requirement must not exceed 3 mm). At the same time drill holes in the bottom of the wall to prepare for the installation of the floor baseboard. Drilling is a bit of a knowledge: to be highly suitable, basically living in the middle of the baseboard; to be even, usually 2.4 meters long skirting line to drill 5 holes to fix, of course, the skirting joint to drill; third should pay attention Avoid the circuit on the wall, so as not to damage the circuit, otherwise it is difficult to determine the position of the circuit according to the position of the cassette.
After sweeping the floor, begin to lay the damp-proof floor mats. In addition to the moisture-proof function, the floor mats can also make up for the unevenness of the floor and increase the floor feeling. It is also worth noting that if the home is geothermal, it needs to be replaced with a special heat-conducting aluminum-platinum mat. The price is 2 yuan per metre. In addition, after the floor mat is finished, it is necessary to use a tape to stick the joints. First, it is afraid of moving, and secondly, it increases moisture resistance.
Formally began to install the floor. Because the floor is to be installed in a staggered manner, a part of the floor is to be sawn in half. Here are some points to remind consumers to pay attention to: First, be sure to open the floor all the way before sawing the floor, pick out the floor with problems or sloppy saws, this can effectively use the partial floor of the problem, do not produce Excessive loss. Don't take the floor and saw it, it will increase the loss. Second, the location of sawing the floor must be selected in the balcony and other places where there is a good tile to take care of the health, otherwise the splash of wood ash will penetrate everywhere, it is difficult to clean.
Because the floor has a certain expansion rate, it is necessary to reserve expansion joints in the places where it touches the wall before paving, so as to prevent the floor from kicking. Of course, this expansion joint is also one of the main channels for the exchange of underground air and ground air. In other words, it is also one of the main channels for underground pollution released into the house. There are also front and rear locks, that is to say, floors with such multiple locks are firmly attached even without glue.
After the floor is finished, the baseboard is installed. There is also a saying on the corner joints of the baseboards. It cannot be a simple 45 degree connection. Since the wall has a certain moisture content, a simple 45 degree connection will result in a drum because there is no space when the baseboard expands. The correct Anfa shall be laid on one side and leave an appropriate expansion gap at the junction with the wall.
Nature Flooring Del Floor Floor Tile Tile Plastic Tile Price Floor Tile Balcony Tile
steel security door,front entry steel doors for sale,used exterior steel doors for sale
Shengyi Door Co., Ltd. , http://www.china-security-door.com