Sometimes it seems that home improvement is a very simple thing. In fact, the details involved are so big. Take the matter of laying wooden floors. When will the floor be laid, and which one is installed first? There are still some details in the floor laying that have not been heard, so what is the process of laying the wooden floor? What details need to pay attention to it?
First, clearly lay the wooden floor first or install the door first
It is recommended to install the floor after installing the door. After the ground treatment, the construction of other projects can be carried out. When the construction period is nearing the end, the floor and wooden door should be installed. Who should install the wooden door and the floor first? Let us analyze it. If the floor is installed first, what problems can't be solved here? First, the position of the buckle between the living room and the bedroom cannot be determined. The process requires that the buckle must be directly under the wooden door, and the buckle cannot be seen inside and outside the door. Secondly, after the floor is installed, the baseboard is made. If the door cover is not installed, the baseboards on both sides cannot be fixed, so the workers who install the floor have to fix it, which wastes both time. First install the door, the door cover can be directly to the ground, when installing the floor, you can use the electric saw to saw the reasonable space under the door cover to lay the floor. The gap under the wooden door can be reserved according to the thickness of the floor, generally about two centimeters.
Second, clear water and electricity installation and laying road map
Hydropower transformation needs to take the dark pipe, so the position of the dark pipe should be clearly marked to prevent the pipe or water pipe from being punched when the floor is installed, to avoid increasing trouble.
Third, need to check materials and check the quality of the floor before laying the floor
After the floor is delivered, the quantity should be counted, the quality of the floor should be extracted, and some spare parts need to be clear to prevent the floor installer from delaying construction until half of the work stoppage.
Fourth, the wooden floor laying slow work out
The laying of wooden floors is not as simple as installing furniture. It needs to be completed step by step. Therefore, do not remind the floor installation masters. The general measurement time is generally 3-5 days, and the floor installation time is 5-7 days ahead. I firmly believe that the slow work is a fine work, and I don’t want to force the master to work.
Fifth, the floor laying needs to be leveled
Face leveling works, the flatness of the ground must be carried out in accordance with national standards, otherwise there will be a feeling of dangling after the floor is paved, and cracks will appear on the floor for a long time. There are many ways to level the room as a whole. Cement and sand are one kind. This method is good for the overall effect. The disadvantage is that the drying period is relatively long, generally around 30h. In addition, in order to save time, use a large core board to directly level (this way can spend a lot of money), the large core board is preferably cut into three pieces, leaving 8 to 10 mm expansion joint between each piece. Having said that, some people may ask if they can use the paving treasure to level the situation. This is a problem that many people are arguing. In fact, the density of the paving treasure is not very high, the time is long, the floor is easy to crack, and the heavy furniture is placed. The location is also easy to sag, personally recommend using the padding treasure to level. (The picture in the text comes from the network)
Guangdong Jia Mei Biological Technology Co.Ltd , https://www.jaymeimask.com