Five Things to Be Paid Attention to in the Construction of Winter Decoration Taboo

In fact, in the winter home decoration problem, most of the climate factors are just primers, not the root cause. The basic reason is whether the materials are properly selected during the decoration and whether the construction process is standardized. If the materials are suitable and the process is no problem, when living, It will save a lot of trouble. Compared with the problems that are likely to occur in the winter, it is more important to pay attention to the matters to be noted during the winter construction.


  Becker bathroom cabinet     FAD Hardware

Problem 1. During the winter decoration, since the plate itself is in a contracted state, if the installation is too dense at this time, the plate will heat up in hot summer temperatures. If the joint is too small at the time of construction, it will be deformed because there is no stretching position in the future. .

The solution: Do not use wood immediately. Many home renovations are related to what materials will come into play. However, during construction in winter, it is best not to use wood as soon as it enters the market, because raw materials are generally stored in the open air, and the outside temperature in winter is very low. Since moisture is easily frozen, it is best to park at room temperature for 3-5 days after entering the site and wait until the wood is “relaxed” before use.

Question 2. Because the paint spraying work must be at minus 5 degrees Celsius, so the temperature has a greater impact on it; the winter climate is relatively dry, the paint concentration increases, not easy to brush evenly.

The solution: ensure the construction temperature. In winter, it is better to have a central heating house. If it is a house with separate heating, in order to save costs, some homes do not have heating during the renovation, but this will affect the construction quality. The best room temperature can be maintained at 5 degrees Celsius or more. If the temperature is too low, it will be easy to freeze on the cement when the putty is put on, and the strength will be reduced, resulting in hollowing and falling off.

Problem 3: In the case of low temperature, there will be several effects on the surface of the material. One is shrinkage, and the other is evaporation of moisture.

The solution: Do not open the window in the windy days. When making wallpapering, puttying, etc., be careful not to open the window. Otherwise, under the circumstance that the wind is very heavy, it is easy to cause the “false dry” phenomenon. The surface looks and feels dry. If you do not do this, it will affect the quality of the subsequent process.

Question 4. Winter construction cannot always open windows. This will affect the emission of harmful gases. When the temperature is low, the harmful gases will also reduce volatilization; after the occupancy, the temperature will rise and harmful gases will affect the living environment.

Solution: Improve environmental awareness. Due to the influence of temperature, winter construction cannot open windows as in other seasons. This will affect the emission of harmful gases. As we all know, when the temperature is low, harmful gases will also reduce the volatilization or stop the volatilization. In this case, after the occupancy, the temperature will rise and harmful gases will affect the living environment. Even environmentally-friendly materials do not guarantee harmful ingredients, but these materials have fewer harmful ingredients. Therefore, in addition to the selection of green building materials as far as possible in the selection of materials, the process to minimize the use or even do not use such a serious non-environmental materials such as antifreeze, but also pay attention to take some late measures, such as the absorption of harmful gases through green plants.

Problem 5. Inconvenient material entering and leaving, causing loss. In cold weather, people are heavy and inconvenient to move. Materials that are easily transported in the wintertime require more effort in the winter, and accidental fall in handling materials may also cause unnecessary loss of materials.

Solution: Take care. Packaging on the outside of easily damaged materials can, on the one hand, prevent scratches, and on the other hand, it can effectively keep the sheets dry.

There are many problems in the renovation, but the owners can not understand all the problems to become decoration experts and then go to the renovation, so it is best to choose the decoration company with high quality and management level, to avoid as much as possible to avoid problems.

Construction acceptance entrance decoration restaurant decoration window home decoration heating house decoration house decoration look decoration company okay ld tiles

Spherical Roller Bearings

Spherical Roller Bearings,Resistant Roller Bearings,Self Aligning Roller Bearing,Metallurgical Special Bearings

Shanghai Yi Kai Cheng bearing Co., LTD , https://www.ykchbearing.com