1, water supply and drainage project
As the galvanized pipe is apt to rust, foul, not keep warm, and will be frozen, it will be phased out. At present, the most used are plastic aluminum composite pipes, plastic steel pipes and PPR pipes. These tubes have good plasticity and toughness, and the insulation does not crack or foul. The use of special copper joints or thermoplastic joints guarantees quality assurance and low energy consumption.
2, electrical pipeline project
General power cord is divided into hard wire, soft wire, sheathed wire, etc., according to the thickness of the copper core is divided into 1 square millimeter line, 1.5 square millimeter line, 2.5 square millimeter line ... ... for safety reasons, more convenient maintenance, power cord should be Bushings. In addition there are audio lines, signal lines and so on. Sockets are divided into 10A, 15A, etc. There are also many types of brands and counterfeits. Poor outlets are prone to accidents, and it is recommended to purchase them in a regular electrical appliance store. Electrical wiring projects require construction regulations. Workers should hold certificates to ensure safety and eliminate hidden dangers.
3, floor base
There are two approaches for the base of solid wood flooring: brushing cold base oil on cement floors, laying wooden keels, and finally nailing floors; another method is to lay a layer of blockboard on the keel first, or a wool floor, and then nail Floor, using this method, the floor is evenly distributed and the structure is firm. Composite floors are easy to install and there are also two ways to do this: one is to make the leveling layer first, then lay the PVC cushion, and then lay the composite floor; the other is on the cement leveling layer, laying the wooden keel and the wool floor, and the two-storey composite floor.
4, retaining wall base
Wall panels are flat and bumpy. The practice is to brush a layer of cold base oil on the wall first, then install a 30mm*40mm wooden keel, nail the multilayer board or blockboard on this basis, and finally nail the veneer plywood. In order to prevent mildew, a series of 6mm diameter courageous holes are opened on the upper part of the visor.
5, door and window cover base layer
First arrange the keel, then nail fine wood board or MDF, the surface with a veneer splint nailed wood. Note that the MDF should be soaked in water to prevent it from expanding in the future.
6, ceiling base
Ceiling materials are gypsum board, gray board, plywood, aluminum alloy buckle board, plastic buckle board, milled glass, stained glass, etc., keel wood keel and light steel keel. Cracking of ceilings often occurs, such as the use of elastic putty joints, and the application of nylon straps can improve this situation.
After the completion of the concealment project, it shall be checked and accepted to ensure that no hidden troubles are left. Only after passing the inspection can the follow-up construction be conducted. Otherwise, if problems are discovered in the future, they need to be reworked, which will not only affect the quality but also delay the construction period. Both the owner and the contractor will suffer losses.
Del flooring Nature Flooring Appliances Home Decoration Glass Sockets House Decoration Style Painted Wall Glass Doors Fashion Small apartment Renovation Home
Yhcb Truck Diesel Pump,Truck Diesel Pump,Diesel Pump For Truck Bed,Pneumatic Gear Oil Pump
Hengshui Yuanhan Trading Co.,Ltd , https://www.yuanhanpump.com