Most wood products need to consider the problem of paint. Therefore, the installation time of the hardware needs to consider the problem of connection with the painter construction. This needs to be considered in two ways:
First, the installation time of the hardware cannot be arranged too early. Otherwise, the painter needs to consider the protection of the hardware too much during the construction;
Second, when installing hardware, be careful not to damage the construction that the painter has already completed.
Therefore, normal construction is often arranged in such a way that the hardware that needs to be drilled is basically completed before the painter is constructed, or before the main process is carried out (the unlocking holes before the door lock is installed are basically at this stage). The drilling of the handle is preferably also arranged at this stage). After the painter finishes the construction, the woodworker will perform the installation work.
2. Installation of electrical lamps and switch socket panels:
The installation of the luminaire and the installation of the switch socket panel should be carried out after the work of painting or wallpapering the wall is completed. There have been cases like this: When a company was working, in order to save personnel expenses, the electrician installed the switch socket too early in the process arrangement. As a result, the painter behind the wallpaper did not pay attention to the protection switch socket and used the wallpaper knife. When the opening of the switch socket panel is opened, the panel is inadvertently drawn.
3. Sanitary ware and bathroom hardware installation:
Due to the low overall management level of our current home improvement industry, the quality of workers at the construction site is generally poor. Therefore, on some construction sites, there have been too many cases where the installed bathtub was first used by construction workers. In recent years, there have been many complaints in this regard. Therefore, unless it is absolutely necessary, it is best not to install sanitary ware before the project begins to accept and most construction workers have not evacuated from the site. Otherwise, it is very likely that the hair left after bathing will be found in your new bathtub.
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn
First, the installation time of the hardware cannot be arranged too early. Otherwise, the painter needs to consider the protection of the hardware too much during the construction;
Second, when installing hardware, be careful not to damage the construction that the painter has already completed.
Therefore, normal construction is often arranged in such a way that the hardware that needs to be drilled is basically completed before the painter is constructed, or before the main process is carried out (the unlocking holes before the door lock is installed are basically at this stage). The drilling of the handle is preferably also arranged at this stage). After the painter finishes the construction, the woodworker will perform the installation work.
2. Installation of electrical lamps and switch socket panels:
The installation of the luminaire and the installation of the switch socket panel should be carried out after the work of painting or wallpapering the wall is completed. There have been cases like this: When a company was working, in order to save personnel expenses, the electrician installed the switch socket too early in the process arrangement. As a result, the painter behind the wallpaper did not pay attention to the protection switch socket and used the wallpaper knife. When the opening of the switch socket panel is opened, the panel is inadvertently drawn.
3. Sanitary ware and bathroom hardware installation:
Due to the low overall management level of our current home improvement industry, the quality of workers at the construction site is generally poor. Therefore, on some construction sites, there have been too many cases where the installed bathtub was first used by construction workers. In recent years, there have been many complaints in this regard. Therefore, unless it is absolutely necessary, it is best not to install sanitary ware before the project begins to accept and most construction workers have not evacuated from the site. Otherwise, it is very likely that the hair left after bathing will be found in your new bathtub.
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn
Coal Activated Carbon For Water Purification
Use: Usedin the purification of drinking water, in-depth treatment of water water etc.
Spec.:
Model NO.
|
Moisture(%)
|
Strength(%)
|
Idine value(mg/g)
|
methylene blue value(mg/g)
|
Ash(%)
|
Packing density(g/L)
|
pH-value
|
Grain diameter(mm)
|
DX-3060 |
≤3
|
≥90
|
≥950
|
≥140
|
≤10
|
530±20
|
8-10
|
Φ1.5
|
DX-3070 |
≤3
|
≥90
|
≥950
|
≥150
|
≤10
|
500±20
|
8-10
|
-
|
DX-3080 |
≤3
|
≥90
|
≥950
|
≥150
|
≤10
|
490±20
|
8-10
|
-
|
DX-4060 |
≤5
|
-
|
≥950
|
≥150
|
≤15
|
-
|
8-10
|
-
|
DX-4070 |
≤5
|
-
|
≥950
|
≥150
|
≤15
|
-
|
8-10
|
-
|
Coal Activated Carbon For Water Purification
Coal Activated Carbon For Water Purification,Coal Columnar Activated Carbon For Water Purification,Activated Carbon For Water Purification,Activated Carbon For Industrial Water Purification
SHIZUISHAN ZhongShi activated carbon co,.ltd , https://www.zscarbonchina.com