Regarding the selection of decoration companies, I would like to say that in fact, choosing a decoration company is a matter of fate. Maybe there will be friction and conflict in the renovation project. In fact, everyone has a heart of kindness and tolerance, and decoration is actually a very happy thing. I chose Lei Yang because of fate. I didn't know this company before. I only heard acquaintances who occasionally mentioned it and I became interested. After several contacts from the quantity room and the communication, I felt very satisfied.
Regarding the purchase of materials, of course, everyone has different choices, different budgets, different goals, different choices of brand materials, naturally, everything is better than the three.
The forum about Shang Tu is actually a good communication platform for everyone who is refurbishing and will be renovated. Oneself is a frog in the bottom of the well. The more people see, the more ideas come together, and the more the final output works, the more satisfying it is. Taking my personal experience, I didn't buy a house before I began to soak up the forums. From the pitfalls of buying a house to the decoration experience, I carefully read and collected everything one by one. So until now, I have become my family's most " Theory of "experienced little master. Whether buying a house or decorating, these theoretical experiences can come in handy.
I am not very good writing style, writing decoration diary, simply hope to give you a reference TX, what difficulties encountered in the decoration, how to solve, can give an upcoming TXM an inspiration.
[Friend ID of this website]: Black Tink
[Unit type]: 2 rooms and 1 hall
[Building area]: 66m2
[Use area]: 41m2
[Decoration budget]: about 140,000
ã€Subcontract method】: Half package
[style]: European style retro
[Renovation company]: Leiyang decoration
The amount paid for purchase (unit: yuan):
Cabinet + bathroom washbasin cabinet: 12500
Parental Room Furniture Deposit: 33000
Mattress: 3000
Toilet: Faenza toilet: 999
Above counter basin: Kohlermema series: 556*0.97 } Toilet four pieces total 3733
Supporting faucet with above counter basin: 1350*0.97
Mirror cabinet: Kohler with silver black lace style: 880
Parent Room Fan + My Room Ceiling Light + Kitchen Restaurant Light: 2000
Decoration deposit: 1000
Kitchen sink: American Standard 650
Bookcase in my room: 3500
Security door: Panpan type 1100+80 foaming agent=1180
Ou Shenuo porcelain tiles: including sanitary wall and kitchen tiles 6200
Covert bricks and public hallway tiles: 216
Di screen wallpaper deposit: 5100 including artificial and glue
Sofa deposit: 1970 (including single sofa and sofa bed)
Property waste clearance freight: 400
Renovation of the first paragraph: 10100
Old Air Conditioner Used Water Heater: -700 (Accounts)
Aupu Yuba: 1150
Outdoor clothes pole: 250
Distribution box (7):325
Cable TV Crossover: 10
Toilet Shifter 5 cm: 25
Two bedroom door locks: 200
Renovation second paragraph: 12900
Vitrified brick cutting sheet: 60
In addition to the bathroom basin faucet, the rest are showers, kitchen faucets and hardware. All are obtained by acquaintances, so free of charge.
Downlight two: 81
Floor drain: 35
Tin foil (three volumes): 25
Large room curtain + small room shutter deposit + chair cover: 1220
Linne water heater (ex-factory price): 1440
Lin Zao shedding two-piece (sample 50 percent): 2070
Water heater installation tip: 120
Add a hole to one eye: 60
Remove hood hood + drawer lock + hinge, etc.: 80
Two Daikin Air Conditioners + One Siemens Washing Machine + One Sony LCD TV + One Siemens Refrigerator: 24270
Activated carbon + formaldehyde detector + tea: 90
Gratuity: 50
Fan installation fee: 30+40 (speed control switch)
Door handle: 48
Home Appliances Government Subsidy Return: -1600
IKEA mirror headlights: 69
Microwave oven rack: 69
Shower curtain frame: 30
80 cm bellows: 25
Inside and outside screws (7 cm) 4 Total: 45
Hook: 25
Basin drop pipe: 60
Washing machine faucet: 55
Toilet installation fee (silica gel): 30
Window Glass Replacement: 450
Furniture table glass: 1000
Mom room computer desk: 350
The third period of decoration: 8000
Decoration tail money: 3900
Learning to decorate the sequence diagram:
|-The week before the renovation |-Water pipes (The shower column should be positioned in advance with the water pipe)
| (Plumbing) |-Cabinet: 1 Order Measurement - Ordered
| |-Mesa: 1 Order Measurement - Ordered
| - Kitchen Appliances: 1 Order
| |-Kitchen Hardware: 1 Order
| |-Smart Cabling - For Engineering Team
| |-Masonry Accessories - Package to Engineering Team
| |-Hydraulic Accessories - Package Engineering
|--Heating: 1 Order Measurement
| |-Switch socket: 1 determine the number of positions - to the engineering team
| |-Lighting: 1 Determine the number of positions
|-Renovation week |-Sanitary Ware: 1 Order - Ordered
| (Carpentry) |-Anti-theft Doors and Windows - Doors for Engineering Team Doors Ordered | |- Faucet Sinks: 1 Order - Ordered
| |-Bathroom appliances: 1 Order
|-Home Appliances: (Central Air Conditioning - 1 Order Design)
| |-Woodworking plates
| | - Ceiling - For engineering teams
| |-Wooden Doors: 1 Order Measurement - For Engineering Team
| |-Sliding Doors: 1 Ordering Measurements - For Engineering Teams
|--and tatami room-nothing | |-balcony window-nothing
| |-Screen: 1 Order Measurement - None
|-Decoration for two weeks | - Wall tiles - Ordered
| (Mason) |-Heating: 2 Installation
| |-Composite floor
| |-Solid wood flooring
|--Floor Service
| |- Stone
| |-Full Carpets: 1 Order
Happy Renovation | Renovation 45 weeks | - Latex paint - For engineering teams
| (Painting) |-Wood lacquer - For engineering teams
| |-Closet
| |-Wooden door: 2 Installation
| |-Sliding Doors: 2 Installation
| |-door lock hardware
| |-Wallpaper - Ordered
| |- Wall Cloth | |-Panel Furniture: 1 Ordering - None
|-All Solid Wood Furniture: 1 Ordering - Parents Room Ordered, My Room Desk Ordered | | - Sofas: 1 Order - Ordered
|- Renovation 6 Weeks |-Cabinet: 2 Installation
| (Hydroelectrician) | - Table: 2 Installation
|--Kitchen appliances: 2 installations
| |-Kitchen Hardware: 2 Installation
| |- Faucet sink: 2 installation
| |-Water Processor | |-Sanitary Ware: 2 Installation
| |-Switch socket: 2 Order installation
| |-Lighting Lighting: 2 Order Installation - Ordered
|--Shower Room
| |-Hardware Hardware - Ordered
| |-Full Carpets: 2 Installation
| |-Bathroom appliances: 2 installation
| |-Stairs: 2 Installation
|-Decoration Week 8 |-Home Cleaning
| (Finalizing work) |-
|__ |-Screens: 2 Installation
Before the renovation, there were a lot of things in the room
Demolition of the wall
The cabinet tiles are knocked out and they feel a lot bigger.
The baseboard of the large room has been demolished
Look at the wall of the bathroom so that the bathroom is still quite big
Slot
Slot
Hydropower acceptance note:
1. Whether electrical products are qualified products that meet relevant standards.
2, the use of fire-retardant dark pipe laying, wire should not have knots and kinks in the pipe.
3. It is forbidden to directly bury the wires in the plaster layer.
4, "Fire line into the switch, the zero line into the lamp", socket wiring should meet the "left zero right fire ground on the" provisions.
5, air conditioning and high-power electrical appliances should be set up alone, the line should use 4 square millimeters line.
6, power lines, television lines, telephone lines must not be installed in the same pipeline.
7. The switches and sockets are firmly installed and the position is correct. The cover plate is upright, close to the wall, and there is no gap around. After the installation of electrical engineering, electrical power should be provided, lighting test light, switch control and so on. After the completion of the project, the customer shall be provided with wiring drawings showing the wire specifications and directions.
8. The elbow should not be bent at the turning point of the electric pipe. It must be inserted into the pipe by a spring. The number of elbows under normal conditions should not exceed 3.
9, the color of the wire should also be implemented in accordance with the specification. Should be: red, blue, two-color line, white.
Embedding
Hanging Air Conditioning Location
Look at the group photo of the board
Here is also, I guess that thin board is used for the siding of our home
Seeing that the workers started to do woodworking, Master Ginger said he was doing the door-door!
In a flash, the master set up a stool and began to dry up.
A large number of cement yellow sand enters the site and the scale is huge
Conch brand cement seems to be a well-known brand
There are so many bricks
Pilesa water pipe
Plumbing diagram
Here is the water pipe that connects the water heater
This pipe is connected to the washing machine, hidden in the cupboard
Tiles approached
The back of the shoe was covered with a layer of steel mesh.
The bathroom shower area can already see the effect
Take a look at pp's siding, it's already stamped on it.
The bathroom wall tiles and bricks have been completely blocked, and the floor drain has also been installed. The overall results are very satisfactory.
Kitchen tiles are also laid
Putty
All the small rooms have been approved, it seems refreshing
The gypsum board above the door of the large room door was rectified and putty has been approved
The original ceiling was also put on putty friends
The ceiling installation master installs wooden pillows for fixing the keel
Beautiful ceiling
Look at the newly installed closet door shutters.
Look at the details though they are not on the paint but they are already
Look at the panorama. It's all white.
The door has been painted on the second time, it's completely white. It feels good.
Ceiling paint has been painted
The shoe in the corridor brushed the paint again, refreshing a lot
Light fixture
Light fixture
Siemens switch
It's very good to put new wallpapers and lamps in the wallpaper
my room
In order to save the wallpaper, the mother did not post it behind the big cupboard. The master said that he had saved more than one wallpaper.
The effect is good
Cabinet installation
Half of the cabinets have been installed.
cupboard
Basic completion
overall effect
Entry of bedroom furniture
Big cupboard
Five-foot king-size bed and nightstand, the headboard is a special request to increase the height of the original two-tiered drawers, raised a layer, into a three-tiered drawer.
The chest of drawers is actually six buckets. The top bucket is flat and may contain jewelry. My mother asked the manufacturer to make a big drawer with five buckets.
The bottom cabinet, and the flower rack to be sent to the base cabinet are very compact - the entire furniture will not appear crowded
The cute little bench was sent. I thought I would send a very simple bench. I did not expect to do so well.
Toilet
I forgot to take a washbasin cabinet in the bathroom. I did it with the cabinet.
Bathroom washbasin cabinet, this special shape is for better use of space
Sliding door finally came ~ I feel pretty good ~ very atmospheric
Beautiful table lamp
Beautiful mirror cabinet
My bookcase
Completed immediately, ready to buy something to suck in toxic gases~
1. 300 grams of black tea is soaked in two basins of hot water, placed in the room, and open the window ventilation, formaldehyde content in the room will be reduced by more than 90% within 48 hours, the pungent odor is basically eliminated.
2, buy 800 grams of granular activated carbon in addition to formaldehyde. Divide the activated carbon into 8 parts and place it in a dish. Place two or three dishes per room. After 72 hours, the indoor odor can be basically eliminated.
3. Prepare 400g of coal ash, put it into the room where you need to remove formaldehyde after packing it with a washbasin, and reduce the formaldehyde content to a safe range within one week. The above method is also suitable for homes that have not been odor-refurbished after renovation, because some of the harmful substances are colorless and odorless, and more points are clean.
4, the soaked tea, inside the refrigerator, you can achieve deodorant effect. If there is no tea, you can cut the lemon or orange, as long as half a small piece can achieve efficacy. In addition, wiping the inside of the refrigerator with a rag with a beer will eliminate odors.
5. Putting green plants in the bathroom of the family can achieve the effect of regulating the air and eliminating odors. It is best to raise a pot of green plants in the window, or put a vase and insert 35 flowers to bring a fresh and pleasant feeling.
curtain
sofa
The sofa instantly becomes a bed~
Renovation Diary Confucius Decorating Study Room Decor Room Window Painter Switch Furniture Kitchen Sink Bedroom Furniture Decoration Find Decoration Company Okay Interior Decor Budget Decoration Style Carved Wall Cabinet Door Panel Furniture Door Flooring Tile Glass Table Kitchen Glass Sliding Door Cloth Sofa Single Bed Mirror Front Light Glass sliding doors Single sofa-beds Glass doors Kitchen wall tiles Glass bricks Blinds Curtains Doors Furniture for kitchen cabinets Furniture cabinets Doors glass Furniture sofas Armchairs Sofas Armchairs Closet chest of drawers Vases Vase glass Doors carved Glass kitchen cabinets Doors Cabinets Doors Bathrooms Tiled toilets Door Bathroom Tiles Color Bathroom Wall Tiles Bathroom Ceiling Material Bathroom Ceiling Monolithic Bathroom Bathroom Design Bathroom Tiles
The East-West glass slide is a glass slide or quartz slide that is used to place a glass slide or quartz slide when it is observed under a microscope. During production, a cell or a sample containing a certain tissue is randomly placed on the slide glass, and a cover slip is placed on it for observation a similar material that produces a phase difference.
microscope slide,slide microscope,slides for microscope,microscope glass slides,slides for a microscope
Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yonyue.com