(I) Construction process
Wall tiles, ceilings, floor tiles, toilets, washbasins and bathtubs, installation and connection of drains, installation of lamps, sockets, mirrors, installation of towel bars and other hardware accessories.
1. The toilet process
Check the ground drain pipe → align the nozzle → flatten the alignment → draw the mark → punch the hole → put the putty → cover the rubber pad → screw on the nut, → mark the two holes on the back of the tank → punch → Insert the bolt → Securely press → Place the back tank with the flat alignment → Screw on the nut → Install the backwater tank elbow → Install the eight-word door → Bend the fork of the maternity lamp → Insert the drift door and the eight-character door → Tighten the nut.
2. Washbasin process
Expansion bolts are inserted → æ» â†’ → → 盆 盆 盆 盆 盆 盆 挂 挂 挂 把 把 把 把 把 把 把 把 把 把 脸 脸 把 把 把 把 把 把 把 把 把 。 。 。 。 。 。 。 →
3. Bathtub process
Bathtub installation: → Launching → Putty tightly closed → Sheung Shui installation → Try to find out
4. Shower process
Cold and hot water nozzles are leveled with test tubes → Measure short section dimensions → Installed on the nozzles → Apply brass to the water inlet of the shower and apply the nut → Tighten on the wall → The upper copper tube is installed in the three ports → Wood screws are fixed to the wall.
5. The process of bidet
Hybrid switch, hot and cold water door cover and nut leveling, → water gate installed → nozzle turn core door installed → hot and cold water door outlet nut tightening → hybrid switch nut tightening → install three water door cover → magnetic bowl installation Good → When installing the nozzle → Install the drain → When installing the handlebar → Adjust the positioning.
(b) Construction essentials1. Wash basin installation construction essentials:
(1) Sink basin products should be flat and lossless. Drain plugs shall have overflow holes of not less than 8mm diameter.
(2) Drain plugs and sinks When connecting, the drain plug overflow hole should be aligned with the overflow hole of the sink basin as much as possible to ensure that the overflow site is unblocked. The top surface of the drain plug should be lower than the bottom of the wash basin after being attached.
(3) Bracket fixing bolts may be galvanized bolts or galvanized metal expansion bolts of not less than 6mm (if the wall is perforated, expansion bolts are strictly prohibited).
(4) After connecting the sink with the drain pipe, it should be solid and dense, and it is easy to disassemble. The joint must not be exposed. The sinks are applied with silicone paste at the wall contact points.
(5) If sink drainage traps and taps are plated products, the coating must not be damaged during installation.
2. Tub installation method:
(1) When the apron tub is installed, the bottom of the apron shall be close to the ground, and a 250-300mm hole shall be reserved in the drainage place of the floor slab to facilitate drainage installation. A manhole shall be provided at the end wall of the bathtub drain.
(2) Other types of bathtubs can determine the height of the tub on the basis of relevant standards or user requirements. Then install the tub after laying two brick bases. For example, the side of the bath tub should be installed with a manhole or a manhole at the drain end wall.
(3) The height of various hot and cold faucets or mixer taps shall be 150mm higher than the upper plane of the bathtub. The chrome plating should not be damaged during installation. Chrome plated cover should be close to the wall.
(4) The height of the fixed shower and hose shower can be installed according to relevant standards or according to user's requirements.
(5) The installation plane of the bathtub must be calibrated with a horizontal ruler and must not be sideways. The joint between the side of the bathtub and the wall is filled with sealant and compacted.
(6) The connection between the tub drain and the drain pipe should be solid and compact, and it is easy to disassemble and the joint must not be exposed.
3 toilet installation points
1) The height of the water supply pipe is usually 250mm from the ground to the center of the valve. If the one-piece toilet is installed, the height of the water inlet of the toilet shall be determined, but not less than 100mm. The center of the water supply valve is generally in the sewer pipe. 150mm to the left of the center or position based on the actual size of the toilet.
2) The low tank toilet uses galvanized bolts or galvanized metal expansion bolts in the tank. If the wall is a perforated brick, expansion bolts are strictly prohibited. A soft gasket should be used between the tank and the nut. It is forbidden to use a metal hard plate.
3) The water tank should be no more than 20mm away from the wall of the water tank and one-piece toilet.
4) The installation of the toilet shall not be less than 6mm galvanized expansion bolts, the soft washer shall be used between the toilet and the nuts, and the sewage pipe shall be exposed to the ground 10mm.
5) When the toilet is installed, put the putty around the bottom drain first, then slowly align the discharge outlet of the toilet with the sewage pipe and press it down to fill the flat surface. Then tighten the gasket nut and remove it. Putty, with a putty filling around the base immediately after cleaning with a wire or wipe.
6) The height of the overflow pipe in the flushing tank should be 30~40mm lower than the wrench hole to prevent water overflow from the wrench hole when the inlet valve is damaged.
(III) Precautions
1. Do not damage the waterproof layer. If there is damage or no waterproof layer, waterproof should be done first, and 12 hours of water leakage test.
2. Sanitary ware is firmly fixed and the pipe connections are tight.
3. Pay attention to finished product protection and prevent bumping sanitary ware.
Bathroom accessories renovation construction knowledge Zhongyu bathroom faucet switch socket
Guide system; Safety System;Traction System;Electric System;Door System;Cabin and CW parts
Please contact with us for your information.
Our company is a professional manufacturer and exporter of elevators and elevator components.The company has a professional technical,sales,production and after-sales team.The main products range from Elevator Door System, elevator electrical control system, to Complete lift renovation and Complete lift OEM. The company has been adhering to the business philosophy of"service and quality are the foundation".We believe that quality service is the guarantee of excellent performance.In order to meet the needs of diferent markets, the company has been constantly improving the product structure to make the product cover more variety, We are committed to creating a one-stop service platform for customers.
We believe that with our high starting point, high quality and excellent service, it will not only bring you reliable products, but a promise of mutual benefit and growth as well..Looking forward to working with you for a beautiful future in elevator industry.
Elevator Spare Parts,Safety Components,Traction System,Shaft Components,Electrical Components,Door System
Suzhou Keffran Parts Co.,ltd , https://www.keffran-elevatorsmart.com