Netizens through their own personal experience to teach everyone new homes need to pay attention to several aspects of indoor acceptance, many people do not understand the indoor acceptance, acceptance of the incident, resulting in disputes and decoration companies later. Therefore, it is necessary for consumers to understand how to carry out inspections for their own homes, and to reduce unnecessary troubles.
Three male Aurora    House home flagship store Â
Since it is so important to understand indoor acceptance, does the acceptance of new houses require attention in several respects?
(1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, and leakage switch shall have a certain height, and the kitchen and air-conditioning shall be laid in dedicated lines. The television antenna and telephone line shall be installed in a position convenient for maintenance.
(2) Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamp marks and rubbing phenomenon.
(3) It is a new masonry wall to be vertical, the bricks have the same level, the seams are even and tidy, the brick joints do not exceed 1 mm, and the overall tile error is not more than 0.8 cm.
(4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm.
(5) It is not more than 0.2mm for the wood seal line, corner line, and waist line facing panel; the angle between the line and the line mouth is not more than 0.3mm; the interface between the veneer and the plate is not more than 0.2mm; the sliding surface of the sliding door is in error Not exceed 0.3mm.
(6) The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter.
(7) It is the straight line of the wall surface, and there is no obvious convexity and color difference within one meter. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria.
Construction Acceptance Notice Concealed Decoration New Home Switch TV Decoration Home Paint Kitchen Sliding Door Decoration Home
Dust Mats,Pvc Dust Mats,Custom Dust Mats,Waterproof Dust Mats
Suzhou Surface Protective New Material Technology Co.,Ltd , https://www.surfaceprotective.com