Renovation seems to be a scratching issue for most people. In fact, Xiao Bian thinks that it is not so scary to imagine. It is important to master some techniques and learn from others' experiences. The experience that Xiao Bian has to say is very useful. It can help you, and I hope your beautiful home will welcome you soon.
waterproof
1, waterproof construction should use waterproof coating
2. The waterproof project should be done after the concealed project construction is completed and accepted
3, After the completion of waterproof construction to do two water storage test
4, the bathroom waterproof layer should not be less than 1.8 meters
5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof
6, floor drain to use deodorant floor drain
7, hot and cold water left hot right cold
8, try not to walk from the ground
9, cold water pipe in the wall should have a protective layer of 1CM, hot water pipe is 1.5CM, so the slot to open deep
10, PPR pipe is installed to consider the thickness of the tiles , so that the pipe will not be exposed
11, only a few minutes to cook, wash vegetables for a long time, bucket must buy big
12, leading and counter basins must be matched, if not, it will not be installed.
13, toilet installation can not use cement , use silicone
14, toilets, taps should be carefully protected after installation
15, to consider the toilet pit when buying a toilet
16, the washing machine to consider whether it is drainage or drainage
17, best not to install the bathroom phone, easy to damp
18, The mirror in the bathroom should first consider the size, otherwise the mirror headlight is very easy to install.
19, bathroom pipe is best to leave the access hole
20, weak electricity can not be worn in the same tube
21, left zero, right phase grounded
22, the power socket is 300 meters away, and the switch is 1.4 meters
23, switch not installed behind the door
24, a lot of sockets should be good
25, high-power electrical appliances with 16A socket , such as electric oven
26, the cassette should be used well
27, cassette must be matched with the panel, otherwise it may not be installed
28. The cross-sectional area of ​​the wires in the PVC wire conduit must not exceed 40% of the cross-sectional area of ​​the wire conduit
29, bedroom air conditioning do not face the bed
30, air conditioning holes to consider outward tilt, otherwise the rain will come in
31, lights try to consider dual control
32, the best bathroom to install splash socket
33, on the balcony to consider a socket
34, wire troughs should be horizontal and vertical, row photos, later use it
35. The public flues must install the reverse valve
36. The bought electrical appliance must allow workers to read the manual
37. Instructions and warranty cards must be kept
Air Conditioner Entrance Renovation Socket Toilet Switch Electric Bathroom Mirror Lights Toilet Waterproof Toilet Door Dimensions Bathroom Tiles Bathroom Dimensions Bathroom Doors Bedroom Tiles Glue Balcony Tiles Bedroom Lamps
Decoration regret and precautions - ceiling
The most classic decoration experience (mason articles)
Renovation seems to be a scratching issue for most people. In fact, Xiao Bian thinks that it is not so scary to imagine. It is important to master some techniques and learn from others' experiences. The experience that Xiao Bian has to say is very useful. It can help you, and I hope your beautiful home will welcome you soon. ...80 couples wedding room petty bourgeoisie marriage room fashion fashion show a member of the exclusive cash discounts Mediterranean style blue + white mosaic even ...
1, waterproof construction should use waterproof film coating. 2. Waterproofing works should be done after the concealed construction is completed and accepted. 3, after the completion of waterproof construction to do 2 water storage test. 4, the bathroom waterproof layer should not be less than 1.8 meters. 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof. 6, floor drain to use deodorant floor drain. 7, hot and cold water left hot right cold. 8, try not to walk from the ground. 9, cold water pipe...
First, the waterway project 1, waterproof construction should use waterproof coating film. 2. Waterproofing works should be done after the concealed construction is completed and accepted. 3, after the completion of waterproof construction to do 2 water storage test. 4, the bathroom waterproof layer should not be less than 1.8 meters. 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof
Home-installed hydropower construction is related to the use of the next few decades, not sloppy, once a problem occurs, the loss is heavy, here put forward some suggestions for construction!
Super Practical: User's 37 Decoration Experiences