Toilet construction attention details cautious

Many families in the renovation have to knock down the original bathroom tiles and lay new tiles. As a result of this, it is necessary to re-waterproof the wall of the bathroom. If there is a quality problem in the waterproofing project, water stains will hit the next room, and if it is heavy, it will leak downstairs, causing serious damage to your home and neighbors.
There are many kinds of materials used for bathroom waterproofing at present, basically the waterproof effect is good. But you should pay attention to the specific construction details.

1, the bathroom floor to do leveling. If you want to change the floor tiles of the bathroom, you must first level the floor with cement mortar after the original floor tiles are cut, and then do the waterproof treatment. This will prevent leakage of the waterproof coating due to uneven thickness.

2, seams to brush in place. The seams between the bathroom wall and the seams between the upper and lower water pipes and the ground are the most prone to problems. During construction, you must urge the workers to handle these corners. All waterproof paint must be applied in place.

3, wall treatment is also very important. In the general bathroom waterproofing treatment, a waterproof coating of about 30 cm in height is also required on the wall to prevent water accumulation from passing through the wall. However, if the wall of the bathroom is a non-load-bearing light wall, the entire wall should be covered with a waterproof coating. If your home uses a two-seater shower screen, the two walls that are associated with it must be fully painted. If your home uses a bathtub, the height of the waterproof coating should be higher than the upper edge of the bathtub.

4, waterproof experiment must do. After the construction of the bathroom was completed, all the water in the bathroom was blocked, and a 25 cm high “can” was built at the entrance. Then, 20 cm of water was poured into the bathroom. After 24 hours, you can check whether there is any leakage around the wall and the ground. This 24-hour waterproof test is the key to ensuring the quality of the bathroom waterproofing project. You must do it.

5, keep the water open. All sewers in the bathroom, including floor drains, sanitary ware plumbing, etc., should be kept open. In this way, we can fundamentally avoid the occurrence of the "flooded seven army" tragedy.

Tile Bath Coatings Home Decoration Room Cement Toilet Waterproof Bathroom Tiles Bathroom Tiles Bathroom Doors

Plastic Optic Fiber Patch Cord

The plastic optic fiber Patch Cord is low attenuation, no heat, flexible, widely use in different purpose. We have different purpose and different function pacth cord. All of the products has CE, ROHS, Reach certificate. Our workshop area more 10000sqm, and we have professional R&D.

The patch cable connects with two connector. This is for different purpose, to [patch" a signal from one side, switch, or router to another side, switch, or router. Use patch cables to carry a variety of signals, such as: ethenet, telephone, and other industrial area.

fiber optic equipment,fiber optic patch cord,fiber patch cord

Jiangxi Daishing POF Co.,Ltd , https://www.opticfibrelight.com