Dongpeng flooring teaches you how to paste composite flooring

Dongpeng floor

Choosing wood flooring as the decoration of the living room floor is a very common practice. In fact, in addition to the living room, the bedroom is also a common one. There are many types of flooring. Generally, only one type is enough. Can the composite floor be paved by itself ? In fact, it is possible, as long as you follow the steps, there is basically no problem, but the introduction of the installation steps of the composite floor is necessary to take a look first, the following Dongpeng floor Let's explain it to everyone, let's take a look.

Composite floor

Can the laminate floor be paved by itself ?

1. The tools used for laying the floor by yourself are very simple. The most basic ones are tape measure, cutting machine, hammer and so on. Tape measure is used to measure the size of the ground and the size of the floor to be cut. The cutting machine generally uses a portable electric cutting machine, which can quickly cut the floor, and the cutting surface is flat without burrs. The hammer will be used when each floor strip is combined to knock on the side of the floor to make the two floors more closely combined.

2. First of all, clean the floor where the floor is paved, there must be no dust, and the ground should be dry and not wet. The composite floor will have a moisture-proof cushion film, which is paved between the floor and the ground to prevent moisture, so that the paved floor will feel better when used. The moisture-proof cushion film should be flat, and the intersection between the two pieces should overlap and merge without gaps.

3. When laying the floor, open all the floors to pick out some problematic ones. Such floors are used for cutting, which can reduce the loss rate. There will be a lot of dust when cutting the floor, so choose to cut outdoors or on the balcony. Pre-paved the floor first, the floors are laid in a staggered way to make them stronger. Therefore, it is necessary to calculate how many floors are cut in half before pre-paving, and measure the center position of the floor with a tape measure when cutting, to ensure that the two cut pieces have the same length, so that the paved floor will be neat and beautiful.

4. The floor should be laid out from the inside of the room to the outside. A complete floor is laid with a cut half of the floor and staggered so that the buckles between each floor can be firmly engaged. It is necessary to apply floor glue to the connection of each floor to enhance the tightness of the connection, so that the floor can be relatively free of deformation. When the two floors are connected, use a hammer to gently tap along the edges to make the connection tighter.

There must be a gap between the paved floor and the wall. This is the expansion gap reserved for the floor at different temperatures, and finally covered with skirting boards. The skirting board must be driven into the wall first, and the snap on the back of the skirting board should be aligned with the fastening member with a firm press to install it. After the floor is paved, you need to make adjustments to make the whole more neat and beautiful. After the adjustment, you need to install a bead between the floors of the two spaces. The bead can be directly glued to the floor using floor glue or glass glue.

Composite floor

Introduction of installation steps of composite floor :

1. Floor cutting

After the floor is assembled, the floor is cut at the side corners. Before cutting, we should first measure the size of the ground and mark the ground. Because the floor is light, it needs to be fixed with one hand and the other hand to control the portable cutting machine. Turn on the power, cut along the mark and remove the excess. Floor cutting is a straight line, so the hand holding the board or the hand of the cutting machine should be as stable as possible.

Second, the corner installation

When the floor is installed to irregular edges, we need to cut the length of the floor according to the actual situation. First, we must measure separately on each side. It needs to be larger than the shape of the floor laying position. By cutting the size, use squares and other tools to be The specific size of the mark; then we use a ruler to measure the ideal position of the width of the laying floor, mark the board; then draw a cutting line with the ruler; finally we use a cutting machine, and then install according to the normal laying method. After finishing the road, there must be some gaps between the floor and the wall. On the one hand, it will leave room to expand and shrink. On the other hand, there is no room for the installation of the base line. The foot line will cover the gap, so it will not affect the appearance.

3. Installation of baseboard

The installation of kicking line is divided into several steps: 1. Measure the length of the ground wire; 2. The length of the ground wire cutting; 3. Fix the leg wire. After laying the floor, you need to lay feet to make the connection between the floor and the wall more beautiful and firm. The entire leg is placed in the installation position, one end is fixed, and the other end is marked with the cutting size; then use this square to measure the cutting line of the correct size, so that you can determine a good leg; then use a small hand hacksaw to cut, cut, Ensure straight line cutting, anchor line cutting; finally it can be repaired.

After finishing the above work, check again, there is an imperfect place to trim it. Then enter the final process. For the installation of the kick thread, the joints to be made are tight and smooth. And make sure you can press the ground wall seam.

Composite floor



The above content is provided by Dongpeng Flooring . Buy the floor and go to Dongpeng Flooring !