National Dangerous Chemicals Rescue Technology Competition Rules (2016 Edition)
Attachment 1
National Hazardous Chemicals Rescue Technical Contest Rules (2016 Edition)
Section I Personal Projects
First, the theoretical examination theory examination questions are all multiple-choice questions, a total of 100 questions, sub-choice single-choice questions and multiple-choice questions, single-choice questions accounted for 70% , multi-choice questions accounted for 30% . The test time is 60 minutes. The exam content is:
(a) Laws and regulations. Including "accidental response law", "safety production law", "fire law", "production safety accident report and investigation and handling regulations", "dangerous chemicals safety management regulations" and other relevant laws, regulations, departmental rules and standards.
(b) Basic knowledge of hazardous chemicals. The characteristics of production, operation, storage, transportation and use of dangerous chemicals, the state's major supervision of dangerous chemicals, the state's major supervision of hazardous chemical processes, emergency pipeline disposal principles, major hazard management, types of accidents, characteristics, emergency handling, and other hazardous chemicals Basic knowledge of accident rescue.
(c) Emergency equipment. Hazardous Chemical Accidents Personal protection, detection, fire extinguishing, plugging, decontamination, demolition and other emergency equipment performance, selection, operation, troubleshooting and other basic knowledge.
(d) Case analysis. Set typical scenes of hazardous chemical accidents, and analyze the emergency disposal plans from the aspects of scientificity, completeness, and correctness.
Second, comprehensive physical fitness
(a) The content of the competition. Complete the 5 horizontal bar body , 25 meters back run to connect fire hydrant stuffy cover 5 times, over 2 meters obstacle board, climb 6 meters pole, 40 meters transport liquid collection barrel.
(b) the purpose of the contest. Inspect physical fitness indicators such as team player's speed, explosiveness, endurance, and coordination to strengthen the body and strength and enhance the basic skills of emergency rescue and self-rescue.
(C) venues and equipment. 100 meters long, 5 meters wide runway ends indicated starting line and finish line, at 2 meters from the start line is placed 2.5 meters high, 1.5 meters wide, a horizontal bar (with pedal), placed 10 meters 1.2 meters high DN65 hydrant analog interface 5, 35 meters ground hydrant button disposed within DN65 boring cover 5 (per 30 cm intervals), 40 meters is placed a baffle plate (2 meters high, 2 meters wide, 0.05 m thick), 50 meters to climb the pole 1 is placed (6 meters high, 4 cm diameter, the upper link rod to the collar, below 0.2 m from the ground floating from the ground line let go indicated 2m), placed 60 meters 25 kg There are 2 tanks .
(four) operating procedures. After hearing the “start†order, the team members completed 5 horizontal bar body movements as required , and completed 5 hydrant cap connections between the two reentry sites. After the capping connection was completed, the 2 meter obstacle board was climbed and the climbing was completed. 6 meters to the top of the pole, the ground down to touch the bell signal, the last line to 60 meters each hand lift a header reaches the end of the barrel, after into the specified location, press the timer. The comprehensive physical fitness field map is shown in Figure 1 .
(e) Operational requirements.
1. During the competition, it is not allowed to intentionally damage the equipment or use any equipment or apparatus provided and provided by the Organizing Committee.
2. Participants are fascinated by the colorful clothes (long-sleeved, green, unmarked), camouflage shoes, half-finger gloves (optional, model number is not limited).
3. The team members shall perform the operations in the order specified by the project, prohibiting interpenetration.
4. Players should operate the bar in the end point direction. After completing a horizontal body roll movement, place a bar on the side of the horizontal bar facing the starting point. The head is lower than the bar, and the two feet cannot touch the ground and do the next roll.
5. Each shuttle run only during boring cover carries a fire hydrant, a complete connection; hydrant boring cover can not be connected to a bayonet.
6. The team must face over the obstacle board and must not step on the obstacle board bracket.
7. From the top of the pole down to the bottom of the loose line can be let go, do not jump in the air.
8. When climbing, no part of the player's body can touch the posts on both sides of the pole.
9. Do not pull on the collection tank during transportation of the collection tank; the collection tank cannot come into contact with the ground.
10. When reaching the finish line, place two liquid collection buckets at the designated position after the finish line.
11. The whole process takes less than 5 minutes.
(6) Assessment of achievements. The timing starts from issuing the "start" command until the end of the timer is pressed.
(seven) judgment rules.
1. The participants did not dress for 20 seconds longer than required .
2. The lever should be operated in the end point direction, with the lower bar on the side of the horizontal bar facing the starting point, the head lower than the bar, and the feet cannot touch the ground. Each time there is a failure, it will add 20 seconds.
3. Hydrant boring cover bayonet connection when applied at 1 per 20 seconds.
4. Step over the obstacle board to step on both sides of the bracket for an additional 20 seconds.
The climbing pole touch both sides of the pillar 1 plus 20 seconds.
6. header tub during conveyance, when each of the contact 1 plus 20 seconds with the ground; drag when the fluid collection bucket travels plus 60 seconds.
7. The arrival bucket is not placed in the designated area for 60 seconds.
8. One of the following conditions will be canceled:
( 1 ) In the competition, deliberately damage the equipment or use any equipment and apparatus provided and provided by the Organizing Committee.
( 2 ) It did not operate according to the operating instructions.
( 3 ) The number of horizontal bars did not reach the specified number.
( 4 ) There is 1 fire hydrant cap not connected.
( 5 ) 1 fold to carry or connect multiple hydrant plugs.
( 6 ) Do not face over the obstacle board.
( 7 ) The climbing pole does not jump to the release line.
( 8 ) In the course of the game, disobey the referee and influence others' competition.
( 9 ) The whole process takes more than 5 minutes.
(8) Safety precautions.
1. Participants should warm up before the competition to prevent joint sprains and muscle strains.
2. The participating players should grasp horizontal bar to prevent falling and falling.
3. When the team members climb poles and flaps, strictly follow the standard operation to prevent falling and falling.
4. During the running of the participating players, pay attention to maintaining the coordination of the body and prevent falling.
Third, the individual rescue and rescue
(a) The content of the competition. Operation Manual hydraulic shears Cut three round steel rods with a diameter of 1 cm to open a rescue tunnel to rescue trapped people and implement pre-hospital care.
(b) the purpose of the contest. Examine the team members' skill in using manual hydraulic rescue tools and implement the skills of individual rescue and pre-hospital emergency care.
(C) venues and equipment. The starting line and the finish line are marked on a runway 30 meters long and 5 meters wide . The equipment placement area is marked 3 meters away from the starting line , and the barrier line is marked at 15 meters . On the right side of the barrier line, a 1 x 1 meter rescue tool placement area is marked, and a soft dummy placement line is marked at 30 meters .
Left equipment placement area, the right side and put a protective pad, the pad is placed on the left side guard CPR dummy 1, the protective pad is placed right hand shears 1 (a closed state), disorder line placed 2 × 1.5 m obstacle (bis away sliding door) 1, 1 cm in diameter is provided round the obstacle 3, software dummy discharge line is placed a protective pad, 60 kg soft protective pad placed dummy (horizontal placement).
(four) operating procedures. After hearing the "start" instruction, the team members carried the manual hydraulic shears to the obstacles and carried out the demolition. After the demolition is completed, place the hydraulic shears in the area where the tools are to be placed. Pass obstacles to the soft dummy and transport the dummy to the protective pad on the right side of the starting line. Then, perform a single-person cardiopulmonary resuscitation on the cardiopulmonary resuscitation simulacrum on the left side protective pad. After the success is indicated, press the timer. The sketch map of the individual rescue and rescue competition is shown in Figure 2 .
(e) Operational requirements.
1. During the competition, it is not allowed to intentionally damage the equipment or use any equipment or apparatus provided and provided by the Organizing Committee.
2. Team members rescue rescue suits, rescue helmets, goggles, rescue gloves, belts, rescue boots.
3. Before the competition, the participating players do a good job of equipment inspection. The manual hydraulic shears must be completely closed, and the soft dummy should be placed horizontally (as shown in Figure 2 ).
4. Demolition round bar must be fully cut before it can be repaired.
5. Dummy cannot touch the ground and obstacles during the handling of the soft dummy.
6. The dummy and equipment must be placed in the designated area and cannot be thrown.
7. Remove protective helmet and protective gloves during CPR.
8. The entire process operation takes no more than 5 minutes.
(6) Assessment of achievements. The timing starts from the "start" command until the cardiopulmonary resuscitation is successful and presses the timer.
(seven) scoring rules.
1. Each piece of equipment that the participating team did not dress as required adds 20 seconds.
2. After the equipment is inspected, the manual hydraulic shears are not completely closed or the soft dummy is not placed horizontally. Each time the additional time is 20 seconds.
3. During the handling of the software dummy, the software dummy touches the ground or obstacle for 20 seconds each time .
4. Before the demolition ends, the manual hydraulic shears touch the ground for 20 seconds each time .
5. Demolition of the round bar is not completely sheared, ie the barrier removal operation takes 20 seconds.
6. After the demolition is over, the manual hydraulic shears are placed over the area where the tool is placed for an additional 20 seconds.
7. The soft dummy is placed over the protective pad for an additional 20 seconds.
8.Personal protective equipment falls off during the competition, and each piece of equipment takes 20 seconds.
9. One of the following conditions will be canceled:
( 1 ) In the competition, deliberately damage the equipment or use any equipment and apparatus provided and provided by the Organizing Committee.
( 2 ) It did not operate according to the operating instructions.
( 3 ) The personal protective equipment fell off during the competition and was not re-applied in time to continue operation.
( 4 ) The whole process takes more than 5 minutes.
(8) Safety precautions.
1. Participants must warm up before the competition to prevent joint sprains and muscle strains.
2. The team members marched to prevent falls.
3. When the team members break down, they must follow the operating procedures to prevent accidental injury.
Fourth, pressure plugging quickly
(a) The content of the competition. Participants wore built-in heavy-duty chemical protective clothing, wore air respirator, entered the device area, climbed onto the second floor platform , and used the metal casing plugging tool to quickly seal the leakage point. After successful sealing, they returned safely.
(b) the purpose of the contest. Inspect team members for rapid wear of personal protective equipment when leaks occur in the process pipelines of hazardous chemical production facilities, and correctly implement rapid response and disposal capabilities for plugging operations.
(C) venues and equipment. The starting line is marked 12 meters away from the platform escalator on the second floor of the installation area , and the equipment placement area ( 2 x 3 meters ) is marked from 10 meters to 8 meters . Equipment placed a protective pad placement area, the heavy-chemical suits, air respirators, masks and the plugging tool are placed in the protective pad. The second floor of the installation area is 5 meters high , the length of the escalator is approximately 7.07 meters , the inclination angle is 45 degrees, and the stair height is 21 centimeters . Layer 1.2 m from the platform at ground level provided DN80 type a pipeline leak. The schematic diagram of the rapid pressure plugging competition venue with pressure is shown in Figure 3 .
(four) operating procedures. After hearing the "start" command, the team members with the help of an assist players in the region to complete the placement of equipment and heavy-duty air respirators to wear chemical protective clothing to wear. Then, under the cover of the water guns of the assisting members, they carried the plugging tools and boarded the platform on the second floor of the installation area. The metal plugging tools were used to quickly plug the leakage points. After th Steel Cable,Stainless Steel Cable,Steel Rope,Stainless Steel Wire Rope Guangdong Gongyou Lift Slings Machinery CO.,LTD , https://www.wmpallettruck.com